Examples of using Phase can in English and their translations into Russian
{-}
-
Official
-
Colloquial
This phase can take several days.
By means of pumping, the water phase, the fat and oil phase can be pumped into the circulation.
This phase can be accomplished in the short term 1 to 4 years.
By the way, this phase can last for years;
The γ phase can only be synthesized under high pressures and temperatures and has a hardness of 35 GPa.
Taking such process, each phase can materialize the ideal goal.
This phase can only be achieved through the“Standby” phase see§ 9.3“Standby” on page 57.
Running the product in reversed phase can break the compressor and other parts.
Any phase can begin at any time, and does not require the completion of previous phases before initiation.
Running the product in reversed phase can break the compressor and other parts.
After some relaxation time, all their characteristics except forthe phase back to its stable value, but the phase can be changed.
Experts spoke about that start in several recent years, and this phase can be characterized as the starting period of the real strategic process.
When little information on an emergency is available and many sources provide inconsistent orconflicting messages, this phase can be extremely challenging.
If the evidence phase can continue in the second half of 2009 and be completed in the first half of 2010, judgement delivery is expected in the first half of 2011;
Lovers, just in a place filled with Reiki end a concentric engraved with the names of the two sides lock phase can Heart rhinoceros, love to the old.
If this is a possibility,particularly if initiation in the vapour phase can propagate to the liquid phase, then tests should be performed which take this into account.
The draw-down in cold-war nuclear weapons stockpiles is at last taking place, butwe do not see how attempting to prematurely multilateralize this preliminary phase can do anything but complicate and retard progress.
This non-equilibrium phase can only form at low temperatures, where the driving force for the reaction is sufficient to overcome the considerable lattice strain imposed by the transformation.
With an effective cooperation of the parties anda strict observation of the work plan, the pre-trial phase can be completed in roughly six to eight months.
In such cases, this phase can be seen as providing the decision as to whether the next iteration should start from the Specify Needs phase, or from some later phase often the Collect phase. .
Observation: This phase can be applied both within the whole sector and in individual HFs, depending on the"field" of the extension of the HF rights and on the readiness of the HF executives and staff to use these rights to improve performance 9.
This phase can be set in the same way as the“CEB 1” phase, with the difference, however, that instead of the interval start based on the number of backwashes, it can be opted for an interval start based on the number of executed“CEB 1” rinses.
This phase could be a reality in the medium term(4-7 years);
Key actions in this phase could include for example.
Liquid phases can be discharged by gravity or under pressure by centripetal pump.
Both the Active and Inactive phases can be crafted.
Doing wrong at any of these phases can ruin a film.
The imbalance between the phases can lead to shortened service life of the electrical equipment, accelerate the frequency of equipment component replacement, and increase the cost of equipment maintenance.
These phases can be estimated by a number of means but all methods can only produce general predictions as the actual conditions on site will invariably differ from the laboratory test conditions.
These phases can be two different solids(e.g., two metals joined together), or a solid and a liquid e.g., a metal electrode submerged in an electrolyte.