Примеры использования On-site inspection на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
On-Site Inspection 0.
Section: on-site inspection.
Report on the twenty-eighth iaea on-site inspection in.
The basis for on-site inspection procedures is being prepared;
Basic right to request an on-site inspection.
Conduct on-site inspection upon approval of the Executive Council;
Request of an On-Site Inspection.
An on-site inspection shall be conducted for the sole purpose of clarifying.
Final Report of an On-Site Inspection.
During the on-site inspection to Al Khafji, both buildings were inspected.
Report on the twenty-ninth iaea on-site inspection in iraq.
During the on-site inspection, the claim was reassessed.
Follow-up after submission of an on-site inspection request.
Progress in the on-site inspection regime has also been steady.
A delegation has suggested moving paragraph 11 to the On-Site Inspection Section.
We have accepted the on-site inspection provision under the CWC.
In turn, will be followed by a meeting of the Friend of the Chair on on-site inspection.
Submission of an on-site inspection request.
The on-site inspection element of the CTBT verification regime must be built.
Verification procedures may include intrusive arrangements such as on-site inspection.
Russia's position on on-site inspection(OSI) issues is well-known.
A second major obstacle relates to verification,particularly on-site inspection OSI.
However, during the on-site inspection the Claimant withdrew this part of the claim.
States parties that ratified the proposed optional protocol would permit on-site inspection of places of detention.
During the on-site inspection, the Claimant increased the amount claimed to SAR 555,074.
The protocols also contain outlines for on-site inspection programmes for each facility.
During the on-site inspection, the Claimant reduced the amount claimed to SAR 17,145,781.
In case of any doubts related to selecting the appropriate device Ecol-Unicon experts will conduct the on-site inspection, identify the possible problems and choose the best method or system for removing odours.
During the on-site inspection, the Claimant reduced the total amount claimed to SAR 40,256.
During the period from 6 to 15 April 2000, at the direction of the Panel, members of the secretariat and expert accounting andloss adjusting consultants travelled to Kuwait to obtain information for the Panel's assessment of the claimants and to carry out an on-site inspection.