Приклади вживання Finishing work Англійська мовою та їх переклад на Українською
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
For finishing work required:.
It is necessary to prepare everything for finishing work.
Finishing work that took you 15 weeks.
IONSTAR reduces time and effort of your finishing work.
After finishing work we throw away the bag.
The materials used in the external finishing work:.
Finishing work that took you 15 weeks.
You can save money and gain experience in finishing work.
After that- finishing work on the floor.
Niche with his hands ready, It is to perform finishing work.
At this stage, finishing work is useful varnish or wax.
The Garfield's had a small business and engaged in finishing work on the premises.
After finishing work, the craftsmen clean everything after themselves.
In 2000, all internal and external finishing work was completed.
Finishing work in this case is minimal, but sometimes necessary.
External and interior finishing work, insulation of facades of buildings.
Finishing work with a fabric ceiling, rubbing it with a paper towel dry.
The range of products for finishing work of the Kleo brand is very large.
All finishing work is carried out only after shrinkage of the timber, because.
After the completion of repair and finishing work, we turn over the turnkey apartment/residence.
After finishing work, do-it-yourselfers can remove the marked point with a damp cloth.
You can purchase only a building frame and independently perform all finishing work.
After finishing work, wash hands thoroughly with warm water and soap.
Supervision and advice for installation and finishing work at each stage of work. .
After finishing work, wash your face and hands thoroughly with warm water and soap.
Everything remains unchanged, from planning on the ground to finishing with finishing work.
Often upon finishing work, I return to it after a while, finalize it.
In the process of carrying out finishing work does not avoid the formation of building dust.
After finishing work we wash the bag with the use of suitable detergent.
In some cases, the finishing work is carried out without the installation of plaster beacons.