IMC strength when removing the formwork.
The formwork for the foundation with his own hands.
Permissible fresh concrete pressure the formwork elements for columns of 100 kN/ m2.
When the formwork is filled with a solution, take the rule and smooth the surface.
Designed for fixing the formwork for manufacturing of various products.
For pouring concreteretaining wall anddug a shallow trench into which the formwork required height.
After removing the formwork walls on both sides plastered with cement mortar.
Opinion of the editor: Pay attention to how the walls and ceiling are trimmed here:it's just concrete from under the formwork. Looks very stylish.
Reinforced layer and the formwork for the foundations under the stove in the bath.
To create a concrete baptismal font is necessary to dig a suitable pit, to ensure waterproofing of the walls,to place the formwork and pour the concrete.
Disassemble the formwork after the concrete has solidified completely in about 20 days.
Later in the formwork stacked valve rods, tying them with wire to the valve, sticking out of the piles.
More time-consuming and costly- to build the formwork and pour the concrete walls and the bottom.
Install the formwork and laid in her dressing fittings from(use rods with a thickness of not less than 12 mm).
These photos were made at the end of April, now the formwork for the 22-th pillar is already fully assembled.
Then create the formwork, in our case, the formwork is better to make thin sheets of metal, you can stick to.
Technical information on installation and dismantling of formwork is contained in"OperatingInstructions for modular formwork" what is included in the formwork assembly.
We have extensive experience in the formwork when it comes to stairs elevators, retaining walls, etc.
In order, what would the formwork is not crushed by the action of the solution and soil, create special spacers.
Cottages№3,4- the walls of the first floor are laid, the formwork for flooding the monolithic floor covering of the ground floor.
It also distinguishes the formwork by appointment- where it is used, and what load the concrete solution will carry- horizontal or vertical.
After 3-4 days it is ripe,frozen material moves away from the formwork wall, and tile can get, freeing shape for the next portion of the solution.
Unedged board will go to the formwork and edging will be used as a base under screed countertops.
In the case of the use of construction scaffolds that supplement the formwork, the construction site achieves rather high results for safety in the performance of work.
On the contrary, we do boards of the formwork of the opening for future cleaning, fixing it with screws or spacers.
By the same principle we do partition in the formwork for the future of cinder blocks at a distance of 390mm from each other.
Later 2-3 day's shoot down the formwork and in a week can enjoy walks along the concrete garden path, hand made.
From the boards it will be necessary to install the formwork and then once again finally pour the solution and properly level the surface.