Examples of using Construction commenced in English and their translations into Arabic
{-}
-
Colloquial
-
Political
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Following four weeks of mobilization, the construction commenced on 4 May 2009.
The construction commenced on 1 May following four weeks of mobilization.
Following four weeks of mobilization, construction commenced on 4 May as scheduled.
Construction commenced in April 1997 and is due for completion in December 1998.
Land clearing for Lines 4 and10 began in November 2003 and construction commenced by the end of the year.
Its construction commenced in 1977 by Urban Council and was opened on 8 October 1980.
Flight paths in and out of Dubai have had tobe changed at various height milestones since construction commenced on Burj Khalifa.
Construction commenced in July 2013 and is scheduled for completion in March 2014.
The Advisory Committee notes that construction commenced two months later than previously envisaged(see A/64/486).
Construction commenced in March 1995 and is expected to be completed by the end of 1996.
The project team was understaffed, with two of the six posts vacant since construction commenced in May 2010.
With project funds, construction commenced on two school buildings to replace five unsatisfactory premises at Irbid camp.
With regard to the construction by the local authorities of the alternate public access road, ECA representatives had been informed that a temporaryroad would be finished by mid-October before construction commenced.
Flight catering facility construction commenced at the Novosibirsk Tolmachevo Airport The operating workshop of Tolmachevo Catering LLC will be integrated in it.
In a ceremony attended by the Prime Minister of Montenegro, other seniorgovernment ministers, and senior executives from One&Only Resorts and Portonovi parent company Azmont Investments, construction commenced on Europe's first One&Only resort.
Construction commenced on 275 new buildings in 53 settlements; 81 per cent were located in areas of the Occupied Palestinian Territory now west of the separation wall.
Olmsted and Vaux were re-hired in mid-1865.[137] Several structures were erected, including the Children's District, the BallplayersHouse, and the Dairy in the southern part of Central Park. Construction commenced on Belvedere Castle, Harlem Meer, and structures on Conservatory Water and the Lake.[130][138].
Construction commenced for Belgravia in 2014 and was duly completed in 2016. Belgravia II followed, and the project has been completed in January 2019 as per its schedule.
Ppmv HC(as propane)(kilns whose construction commenced after April 19, 1996 at a plant site where a cement kiln(whether burning hazardous waste or not) did not previously exist).
Construction commenced with estimated 5 per cent of the project completed as at 30 June 2005 owing primarily to the delay in completion of the procurement process for the rental of the logistics base site.
Following receipt of funding, construction commenced on priority sewerage and drainage works in the northern part of Deir el-Balah camp, for which detailed designs had been completed the previous year.
Since construction commenced, the project ' s construction manager has removed over 62,000 cubic yards of material from the site, 95 per cent of which has been recycled and diverted from landfills; 98 per cent of the glass, steel and aluminium material from the original Secretariat Building curtain wall has been recycled.
The Secretary-General also indicates that construction commenced on 1 May 2010 and was planned to be substantially completed by the end of February 2012, but that the construction period had to be extended by six months because cement had to be imported owing to its lack of availability on the local market.
With project funding, construction commenced on a two-storey building in Nahr el-Bared camp to accommodate the camp's CRC and a youth centre, both of which would be managed by locally elected committees, with support from UNRWA and non-governmental organizations.
During the reporting period, illegal constructions commenced on land adjacent to UNRWA premises in the Gaza Strip and the West Bank.
The construction phase commenced two months later than anticipated in the previous report.
Construction work commenced in late September 2005 and is planned to be completed by March 2006.
Construction of the landmark commenced in October 2003.
It is important to clearly incorporate such indicators, as construction commences, into a periodic report and monitor them closely.
All new Government buildings with construction commencing after 1 December 2008 will meet the mandatory requirements as set out in DM 2008, and wherever practicable, achieve a standard beyond the statutory requirements.