Examples of using Network codes in English and their translations into Croatian
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
The network codes.
The rules have now been formalised in the first legally binding network codes for gas.
Network codes and guidelines.
Ö Tasks of the Agency as regards the development and implementation of network codes and guidelines Õ.
Those network codes should be in line with non-binding framework guidelines, which are developed by ACER.
Regional initiatives are also proving their concrete value in the(early)implementation of network codes.
(e) implementing the network codes and guidelines adopted pursuant to Articles 59, 60 and 61 of Regulation(EU) 2019/….
Transmission system operators should operate their networks in accordance with those network codes.
Network codes and framework guidelines adopted in accordance with Regulations(EC) No 714/2009 and(EC) No 715/2009.
Transmission system operators should operate their networks in accordance with those network codes.
(16) provides for the Commission to adopt guidelines or network codes to achieve the necessary degree of harmonisation.
Substantial progress has been made in implementing existing EU energy legislation,in particular the Third Energy Package and the network codes.
(d) be without prejudice to the Member States' right to establish national network codes which do not affect cross-zonal trade.
The EESC agrees with the European Commission on the need to make optimum use of existing storage capacity by completing work on network codes.
Transmission system operators shall develop network codes and harmonised contracts following proper consultation with network users.
The Agency has an important role in developing framework guidelines which are non-binding by nature(framework guidelines) with which network codes must be in line.
The network codes prepared by the ENTSO for Electricity are not intended to replace the necessary national network codes for non-cross-border issues.
For example, different trading mechanisms; state interventions;development and implementation of network codes; and level of market integrity and transparency.
The Commission is empowered to amend the network codes within the areas listed in Article 59(1) and(2) in accordance with the relevant procedure set out in that Article.
Following that process, the Agency may make reasoned proposals for amendments to the Commission,explaining how such proposals are consistent with the objectives of the network codes set out in Article 6(2).
The ENTSO for Gas shall elaborate network codes in the areas referred to in paragraph 6 of this Article upon a request addressed to it by the Commission in accordance with Article 66.
The European Network of Transmission System Operators for Electricity(ENTSO-E) currently plays an important role in coordinating Transmission System Operators(TSOs)and developing network codes.
The ENTSO for Electricity shall elaborate network codes in the areas referred to in paragraph 6 of this Article upon a request addressed to it by the Commission in accordance with Article 6(6).
Any regulatory authority andthe Commission may request the opinion of ACER on the compliance of a decision taken by a regulatory authority with the network codes and guidelines referred to in this Directive or in Chapter VII of Regulation(EU) 2019/…(68).
These binding European rules,referred to as Network Codes, are being developed, adopted and increasingly applied in the day-to-day practical functioning of the gas and electricity wholesale markets.
Any regulatory authority may inform the Commission where it considers that a decision relevant for cross-border trade taken by another regulatory authority does not comply with the network codes and guidelines referred to in this Directive or in Chapter VII of Regulation(EU) 2019/….
Where the ENTSO for Electricity has failed to implement such network codes, ACER shall request the ENTSO for Electricity to provide a duly reasoned explanation as to why it has failed to do so.
The ENTSO for Gas may elaborate network codes in the areas set out in paragraph 6 with a view to achieving the objectives set out in Article 4 where those network codes do not relate to areas covered by a request addressed to it by the Commission.
Therefore, the question of transmission tariffs to and from storage should be addressed in work to develop EU-wide network codes so as to ensure a level playing‑field between competing flexibility instruments, and tariff structures should reflect costs.
The ENTSO for Gas may elaborate network codes in the areas set out in paragraph 6 with a view to achieving the objectives set out in Article 4 where those network codes do not relate to areas covered by a request addressed to it by the Commission.