Examples of using Feasibility study in English and their translations into Czech
{-}
-
Official
-
Colloquial
And we are ordered to make a feasibility study.
Ability to create feasibility study of building for waste management.
At present, the Commission is simply preparing a feasibility study.
Basic tools for feasibility study of a project.
I was pleased to co-sign Amendment 3, calling for a feasibility study.
Ability to create feasibility study of farm building.
However, the possibility of applying such a tax exclusively at European level should first be the subject of a feasibility study by the European Commission.
Energy audit and feasibility study, optimization of energy management of energy systems.
There are other aspects, but trade is a very important one,and there is a feasibility study on trade already on the way.
In the case of F2 primates, no feasibility study has been done to see whether it is possible to do what the Commission is proposing.
On the basis of government resolution Czech Ministry of Transport prepare feasibility study of water corridor Danube-Oder-Elbe.
Feasibility study of research and development in the simulation of fast dynamic processes with high gradient of load or relative deformation 2016.
We are therefore able to continue this feasibility study into an alternative solution.
An FTA needs to be strengthened in the areas of combating climate change andI therefore welcome the Commission's planned feasibility study in this area.
It is a project that at this stage is undergoing a feasibility study that will be performed jointly by ENI and Gazprom.
I will ask you once again, Mr Barroso:when will Mr Šemeta comply with the demand made by this Parliament at the beginning of this year, namely that we want a feasibility study for Europe, too?
One of the framework conditions for this feasibility study is that competitiveness should not be impaired by the financial transaction tax.
Second phase focusing on integration of social security andhealth insurance collections- requires unification of revenue processes- Decision to conduct a feasibility study for implementation of JIM CZECH REPUBLIC.
In the quotation phase- from the initial inquiry and feasibility study to the product calculation and solution quotation- the SEC works closely with Sales.
The feasibility study on issuing joint Eurobonds could constitute an opportunity to examine in greater detail financial instruments for defending against speculation, and to put them into practice.
The European Council in its resolution 1473(2005) called on Czech Republic, Austria, Slovakia andPoland to speed up the feasibility study of Danube-Oder-Elbe project and intensify political negotiations.
The feasibility study and implementation phase are funded by the AGIS programme and, since September 2005, this database used by Interpol is funded mainly by G8 governments and private companies.
Lucie Židová from the ÚJV Řež, a division Energoprojekt Praha presented work carried out to date in the feasibility study and tested a possible placement of SMR concepts in areas of existing fossil plants.
The feasibility study at the end of 2005 offered a rather general assessment of the current situation, but does not provide a clear answer as to the best policy option and the possible elements of the EPC statute.
The Czech partner used its experience in water supply andsanitation for preparing a feasibility study on construction of wastewater treatment plant and sewage network system in Svrake municipality of Vogošća.
Last year, a feasibility study by the Directorate-General for Justice found differences in access to protection orders, the availability of support services and the expertise and capacity of the responsible public servants.
Consequently, based on the received information the experts will carry out a risk analysis and a feasibility study that will provide identification of the temporary risk reduction and the consequent realization of permanent corrective measures.
For a successful submission of grant applications, it is usually necessary to carry out a thorough initial analysis of the project, to evaluate all project risks,to analyse the possibility of aid under the de minimis regime and to carry out a feasibility study.
It is right andprudent that we should wait for that feasibility study to see if it is economically sensible for us to go ahead unilaterally, without the rest of the world.
I would also like to know why the European Council, the Belgian Presidency, said that it is in favour of this, butwhy the European Council at its last three summits merely said that it recommended a feasibility study at global level but not at European level.