Examples of using Equivalent tests in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
Non-native English speakers must achieve 6.0 overall with no component less than 5.5 in IELTS or equivalent tests.
The appropriate tests and checksdefined by the applicable standard(s) referred to in Article 5, or equivalent tests, must be carried out in order to ensure conformity of the lift with the relevant requirements of the Directive.
Besides examinations or equivalent tests for each discipline, at the end of the second cycle there is to be a comprehensive examination or equivalent test, whereby the student proves that he has received the full and scientific formation demanded by the cycle.
The notified body must examine the explosive and carry out the appropriate tests as set out in the relevant standard(s) referred to in Article 4, or equivalent tests, to ensure its conformity with the relevant requirements of the Directive.
Besides examinations or equivalent tests for each discipline, at the end of the second cycle there is to be a comprehensive examination or equivalent test, whereby the student proves that he or she has fully received the scientific formation demanded by the second cycle.
The appliances constituting a sample are examined individually and appropriate tests, as laid down in the respective standard(s) referred to in Article 5, or equivalent tests are carried out to determine whether the batch is to be accepted or rejected.
Besides examinations or equivalent tests for each discipline, at the end of the first and of the second cycle there is to be a comprehensive examination or equivalent test, so that the student proves that he or she has fully achieved the scientific formation intended by the respective cycle.
The notified body must examine the pyrotechnic article and carry out the appropriate tests as set out in the relevant harmonised standard(s) referred to in Article 8, or equivalent tests, to ensure its conformity with the relevant requirements of the Directive.
Products in a sample shall be individually examined and appropriate tests as set out in the relevant standard(s)referred to in Article 5, or equivalent tests,-shall be carried out to ensure their conformity with the requirements of the Directive which apply to them and to determine whether the lot is accepted or rejected.
The notified body shall examine the individual equipment or protective system and carry out the appropriatetests as set out in the relevant standard(s) referred to in Article 5, or equivalent tests, to ensure its conformity with the relevant requirements of the Directive.
All instruments in the sample shall be individually examined and appropriate tests as set out in therelevant documents referred to in Article 9, or equivalent tests, to establish their conformity with the metrological requirements that apply to them shall be carried out to determine whether the lot is accepted or rejected.
The notified body shall examine the technical documentation for the subsystem or the safety component and shall carry out the appropriate examinations and tests, as set out in the relevantharmonised standards and/or technical specifications, or equivalent tests, to ensure its conformity with the applicable requirements of this Regulation, or have them carried out.
A notified body chosen by the manufacturer shall carry out appropriate examinations and tests, set out in the relevant harmonised standards and/or equivalent tests set out in other relevant technical specifications, to check the conformity of the product with the applicable requirements of this Directive, or have them carried out.
The notified body shall examine the instrument and carry out the appropriate tests, as set out in the relevant harmonised standard(s)referred to in Article 6(1), or equivalent tests, in order to ensure its conformity to the relevant requirements of this Directive.
An adequate number of appliances must be examined and appropriate tests as set out in theapplicable standards referred to in Article 5 or equivalent tests must be carried out in order to ensure conformity with the corresponding essential requirements of this Directive.
Unit verification(Annex IX): Examine individual equipment or protective system and carry out tests as defined in the harmonised standards, if they exist, or otherwise inEuropean, international or national standards or conduct equivalent tests to ensure conformity with the relevant requirements of directive 94/9/EC and draw up a certificate of conformity.
All instruments shall be individually examined and appropriate tests as set out in therelevant documents referred to in Article 9, or equivalent tests, shall be carried out to verify their conformity with the metrological requirements that apply to them.
Under the quality system, each product must be examined and appropriate tests as set out in the relevant standard(s)referred to in Article 5 or equivalent tests shall be carried out in order to ensure its conformity with the relevant requirements of the directive.
A suitable sample of the finished products, taken on the spot by the notified body, is examined and appropriare tests, defined in the applicable standard orstandards referred to in Article 5(2) or equivalent tests are carried out to check the conformity of the product with the requirements of the corresponding Directive.
All pyrotechnic articles shall be individually examined and appropriate tests as set out in the relevant harmonised standard(s)referred to in Article 8 or equivalent tests shall be carried out in order to verify their conformity with the relevant type and requirements of the Directive.
A suitable sample of the finished products, taken on the spot by the notified body, is examined and appropriate tests, defined in the applicableharmonised standard referred to in Article 8 or equivalent tests are carried out to check the conformity of the product with the requirements of the corresponding Directive.
An adequate sample of the final products, taken by the notified body before the placing on the market, shall be examined and appropriate tests as identified by the relevant document(s)referred to in Article 9, or equivalent tests, shall be carried out to check the conformity of the instruments with the appropriate requirements of this Directive.
All appliances or fittings in a sample shall be individually examined and appropriate tests set out in the relevant harmonised standard(s)and/or technical specifications, or equivalent tests, shall be carried out in order to ensure their conformity with the applicable requirements of this Regulation and to determine whether the lot is accepted or rejected.
The average percentage of gold extracted from the individualbottle roll tests agreed well with the equivalent test carried out on each composite.
We will refund you with twice the difference if you find an equivalent test that can be bought cheaper elsewhere within 30 days of ordering your test. .
Other applicants should provide results either from IELTS(minimum required points: 6.5; in addition, 6.5 points from at least three components) or from TOEFL(minimum required points:90) or from an equivalent test e.g. CAE.
Foreign students also either need to document that they have passed the German language exam for university access for foreign student applications(Deutsche Sprachprüfung für den Hochschulzugang ausländischer StudienbewerberInnen; DSH) or an equivalent according to the DSH examination regulations or the Test of English as a Foreign Language(TOEFL)with at least 530 credits or an equivalent test.
Only the Goethe-Zertifikat A1 of the Goethe-Institut or an equivalent test will be recognized.