Examples of using Parallel operation in English and their translations into Spanish
{-}
-
Official
-
Colloquial
Parallel operation up to 4 devices.
Flow up to 70 m3/h(135 m3/h in parallel operation).
A parallel operation is currently not possible.
Control panel for parallel operation between gensets.
Parallel operation with up to 4 units(option).
Optional symmetrical load distribution for parallel operation.
Parallel operation between gensets and with the mains.
It can realize automatic remote control and automatic parallel operation.
Optional parallel operation up to 9 units. SOLUTIONS.
When inserting a large numbers of rows, the parallel operation can improve performance.
Parallel Operation Max up to 6 units for 3-5kva.
Control panel for the parallel operation of the three supplied gensets.
Parallel operation with most standard detectors.
Write Speed: Parallel operation, up to 480Mb/s for each slot.
Parallel operation up to 6 units only for 3KVA-5KVA.
Gradually, the parallel operation was extended until the end of 2001.
Parallel operation of heating and DHW preparation.
G/kWh parallel operation possible such as public net+ 2.
Parallel operation was extended to the end of 2001.
Parallel operation.(selected through jumper). Only full version.
Parallel operation up to 4 units available for versions 4 -5 KVA.
Parallel operation with up to 4 units only available for PV200 4KVA/5KVA.
Parallel operation with 24-hour changeover(dual pump configuration).
Parallel operation with up to 4 units only available for MUST PV18-4K/5K.
Parallel operation with up to 3 units[Available for MUST PV18-4K/5K MPK].
Parallel operation with up to 4 units only available for MUST PV18-4K/5K.
Parallel operation with up to 4 units only available for PV200 4KVA/5KVA.
Parallel operation with up to 9 units only available for 5KVA/5KW HYB5032MN.
Parallel operation(efficiency-optimised peak-load activation and deactivation).
The parallel operation of inductive(wound) and capacitive(electronic) transformers is not allowed!