Примеры использования Deposit development на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
A Commercial Deposit Development Project; and A Feasibility Study“FS” or TEO.
Some aspects of geomechanic justification of diamondiferous deposit development projects.
The project provides deposit development with aggregate balance stock of black coal in the amount of 820 million tons.
Ukraine and the company agree the development plan and deposit development licensing procedure.
Deposit development dated back to XVIII century, when a unique vitrolic and remedial lake was discovered.
Geomechanic justification of copper-bearing iron ore of Oktaybrskoe deposit development// Marksheidersky Vestnik.
Previously, techniques of peat deposit development and methods of obtaining valuable products of the economy were implemented in our country too.
Economic efficiency assessment of environmental renovation in mineral deposit development.
The total amount ofdamage, based on periods of the deposit development and regeneration ofdisturbed landscapes, is 110 million rubles, which is comparable to the profitfrom the deposit development. .
The construction of Balkhash thermal power plant,chemical complex in Atyrau region, and Zhambyl deposit development.
That is, if you are ready to offer a contractor a deposit development program, including drilling of several wells, then you can talk about price reduction and volume discounts.
Ensure annual level of dust processing andgold production in accordance with the technical project of the deposit development.
The timeline for the minerals extraction enterprise reaching the project capacity is determined by the deposit development technical project, coordinated and approved in accordance with the established procedure.
The software products GemcomSurpac, GemcomWhittle, GemcomMinex,enable the planning of mining operations and management of deposit development.
As for its educational efforts,LUKOIL has implemented an extensive project to equip the deposit development class-room of the Astrakhan State Technical University Oil-and-Gas Department with simulators and software.
A strategic goal map and criteria for project assessment of the West Arctic shelf deposit development has been made;
Within ten years to come,according to the existing project document for deposit development between 2022 and 2024, it is planned to reach the highest production levels in the Achimov blocks of the Urengoyskoye oil, gas and condensate field- up to 36 billion cubic meters of gas a year and 10.8 million tons of unstable gas condensate.
The level of mineral raw material extraction andthe timeline of reaching the project capacity are determined by the mineral deposit development technical project.
The deposit development economy was improved by the following innovative solutions:• Computer technologies and 3D modelling for re-estimation• Stage scenario for preparation and separation cycles of primary ore processing The above technological solutions complex can be realized in other skarn iron deposits in Russia and abroad.
Other relevant publications include mineral resource assessment andenvironment studies; uranium deposit development and production.
The main drawbacks of oil and gas deposit development systems if traditional approach is used are conditioned by the fact that development projects are based on the models of PM1 type which do not consider revealed particularities of the fluids cross-flow between different parts of the reservoir and their smallscale block structure 13, 16, 19.
The module simplifies and accelerates the work for preparation of project documentation andimproves visualization during analysis and comparison of deposit development methods.
Here you should understand that before refining, gold and silver should be processed through several stages,starting from geological exploration, deposit development, gold-bearing ore and concentrate production, hydrometallurgical processes that involve flotation, sorption, desorption, etc.
Preparation and approval in accordance with the established procedure of technical project of shutdown or abandonment of the mine openings, wells, other underground structures, as agreed upon in accordance with the Russian Federation Law'On Subsoil',no later than 1 year before the planned deposit development completion deadline.
The software package enables users to perform the comprehensive list of design work starting from analysis and uploading of geological andgeo-physical data up to creation of standard reports on deposit development optimization and efficiency of the suggested geological and technological models.
License type: Minerals exploration and mining Main license provisions concerning the subsoil user's obligations, stating the deadline for the fulfillment of such obligations: The level of crude minerals production andthe timeline of reaching the design capacity are determined by the technical project of the deposit development.
This foresees execution of field seismic studies using the 3D technique in two license blocks; reworking and reinterpretation of previously performed seismic studies; optimization of geological andtechnological models of deposit development; calculation of hydrocarbon reserves and approval in the GKZ State Commission of Ukraine on Mineral Resources.
Large-scale events for localization of polluted areas, elimination of possible industrial water flows from reservoir pressure maintenance system, all-round embanking of producing facilities, strengthening of the coastal line, preparation of dugs and access roads, andother events for the infrastructure- all these allow reducing risks of ecological consequences of oil deposit development.
License type: Exploration Main license provisions with regard to the subsoil user's obligations specifying the time of performance thereof:The timeline for the minerals extraction enterprise reaching the project capacity is determined by the deposit development technical project, coordinated and approved in accordance with the established procedure.
In addition, part of the equipment in stock, which is a pool of spare parts and mechanisms for field operations andis needed for future projects of deposit development, was also seized.