Примеры использования Lifetime extension на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Hungary(Paks NPP lifetime extension);
It is a long-term commitment, but one for which there may not be a lifetime extension.
EIA/IC/INFO/19 Czechia Planned lifetime extension of reactors at the Dukovany nuclear power plant.
Nuclear reactors in Ukraine that expect EU financing for their lifetime extension.
In order to license the design lifetime extension of the ANPP Unit No 2 for its safe operation, the RA Government plans to.
Люди также переводят
Unit 1 in the South Ukraine power plant has been granted a ten years lifetime extension in 2013.
Lifetime extension of reactors by 20 years of operation(depending on the results of non-destructive testing(NDT) conducted in compliance with the inspection plan).
For more on Ukraine's nuclear units lifetime extension program see here.
Regulatory support to the activity under the Comprehensive(integrated)NPP Safety Improvement Program, NPP lifetime extension;
For more on Ukraine's nuclear units lifetime extension program see here.
Unit two in South Ukraine will reach that point inless than three weeks, meaning that the SNRIU must now decide whether to grant that unit a 20-year lifetime extension.
The documents submitted by the Energoatom Company that justify possible lifetime extension of Rivne NPP- 3 and Zaporizhzhya NPP-3 are currently under assessment.
Power uprate activities, in terms of the required measures and possible timeframes,should be interrelated with lifetime extension activities.
Thanks to these efforts, the South Ukraine plant was granted a ten-year lifetime extension permit in 2013 by the State Nuclear Regulatory Inspectorate SNRIU.
Pilot power uprate activities with Westinghouse fuel are expected at SUNPP-3;they are likely to be combined with lifetime extension activities.
The EBRD explicitly admits here that the decision on a new licence(and thus a lifetime extension) will be made after safety and other upgrades have been implemented.
In its meeting on April 30,2015, the nuclear regulator ruled that the unit has 33 safety deviations which need to be eliminated for a lifetime extension to be considered.
A report was made by Vasily Lylak, ZNPP Chief Specialist on Reconstruction and Lifetime Extension of the Power Units- Head of ZNPP Service for Reliability, Resource and Modernization Management.
Request Ukraine to improve its legislation to provide for the application of the Convention in similar cases of the lifetime extension of nuclear installations;
According to the Council's decision, a lifetime extension license for this 30 year old nuclear unit could be considered in the future, but only if all required conditions are met.
By the end of April, SNRIU will have to make a decision on a 20 years lifetime extension license for this unit.
The Committee provisionally concluded that the lifetime extension of NPPs could be considered as a major change to an activity in appendix I, and thus fell under the scope of the Convention.
This of course is effective considering long operating time lifetime extension by 20 years.
According to Chairman,the procedure applied for lifetime extension of nuclear facilities fully complies with requirements of the International Atomic Energy Agency(IAEA) and does not differ from the world practice.
At the same time, it should be noted that the first priority of course is lifetime extension of operating power units.
Lifetime extension: ESI brings together material laws and tools for prediction of material properties evolution and advanced simulation capabilities to control degradation phenomena and evaluate the risks associated with material aging.
During the Board Meeting it was mentioned that such a state could become an obstacle for timely lifetime extension of Ukrainian NPP Units.
Having determined that the lifetime extension of the two nuclear reactors was a proposed activity under the Convention, the Committee had to establish whether such an activity had a significant adverse transboundary environmental impact.
Prague, Kiev- In December 2013, Ukraine's State Nuclear Regulatory Inspectorate(SNRIU)has granted a 10 years lifetime extension license to unit 1 in the South Ukraine nuclear power plant.
Therefore, the licence authorizing the lifetime extension for the Rivne NPP reactors 1 and 2 was not a final decision in the meaning of article 6, paragraph 1, of the Convention and the activity had not been subject to an EIA procedure under the Convention.