Примеры использования Waterway на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
I-01 Waterway.
Carrying out work in the waterway.
The waterway network.
Non-navigable waterway.
MERSEY Waterway Limit- Eastham Locks.
Люди также переводят
I-02 Navigable inland waterway.
Inland Waterway Limit- Gransen Mouth.
Various sections of the Berlin region waterway network.
Waterway to Siberia in the Vologda province/ B.
European inland waterway network 81- 83.
Waterway Limit- Eastham Locks 10.00 VIa A.
Volgo-baltijskiy waterway and rybinsk reservoir.
Waterway category a(width to 20 m)- board type 1.
European Development Plan for waterway infrastructures and transhipment facilities.
Waterway category b(width 20- 60 m)- board type 2.
Renumber existing E 91- 03 waterway as E 91- 05[Padova-Venezia Canal]3.
E 15 waterway- upgrading the Amsterdam-Lemmer section to class Vb.
ST.1 Transit of vessels andcargo at certain points(locks) of the waterway.
Federal Waterway Authority, Germany: http://www. wsv. de.
External factors(bad weather, unfavourable conditions of the waterway, etc.), or.
E 12-02 waterway- upgrading Zwartsluis at Meppel-Ramspol.
Article 3.28: Additional marking for vessels under way carrying out work in the waterway.
E 06 waterway-- increasing the capacity of the Kreekrak locks.
Position reports shall be sent at certain reporting points at the waterway.
III. Inland waterway infrastructure(agenda item 2) 9- 16 5.
In the cases referred to in paragraph 6 of this article, the illuminated buoys shall separate the waterway from the berthing place.
III. Inland waterway infrastructure(agenda item 2) continued.
These fortifications, nicknamed by the contemporaries"the Russian Dardanelles",were designed to control the gulf waterway.
East-West waterway rivers Warta, Notec, Brda, and Bydgoski Canal.
However, on the third day of the occupation were arrested the leadership of Lenin and Waterway district committees and related messenger of underground regional committee RC.