What is the translation of " INITIAL OPERATIONAL " in Indonesian?

[i'niʃl ˌɒpə'reiʃnəl]
[i'niʃl ˌɒpə'reiʃnəl]
operasional awal
initial operational
early operational
initial operating
initial operation
initial operational
operasi awal
initial operation
initial operating
early operating
initial surgery
operation earlier
initial operational
early working
preliminary operations
early surgery

Examples of using Initial operational in English and their translations into Indonesian

{-}
  • Colloquial category close
  • Ecclesiastic category close
  • Computer category close
  • Ecclesiastic category close
Dedicated Initial Operational Test and Evaluation.
Dedikasi Awal Operasional Test dan Evaluasi.
The first CH-53K aircraft are expected to reach initial operational capability in 2019.
CH-53K harus mencapai kemampuan operasi awal di tahun 2018.
Initial Operational Capability is planned for 2024.
Kemampuan awal operasional akan direncanakan untuk tahun 2024.
The CH-53K is slated to see initial operational capability toward the end of 2019.
CH-53K harus mencapai kemampuan operasi awal di tahun 2018.
Ford is expected to be operational in 2020 following achievement of initial operational capability.
Ford diharapkan bisa beroperasi pada tahun 2020 setelah mencapai initial operational capability( IOC).
People also translate
Initial operational reporting indicates more than 30 insurgents were killed in the failed attack on the outpost”.
Operasi awal melaporkan lebih dari 30 gerilyawan tewas dalam serangan mereka yang gagal terhadap pos terluar.
JASSM-ER successfully completes Initial Operational Test and Evaluation(LOT&E).
Pada November 2004, HIMARS berhasil menyelesaikan tes awal operasional dan evaluasi( IOT E).
The“modest” initial operational target is to accommodate 72 million passengers and 2 million tons of cargo annually by 2025.
Target operasional awal yang sederhana adalah untuk menampung 72 juta penumpang dan 2 juta ton kargo setiap tahun pada tahun 2025.
In November 2004, HIMARS successfully completed initial operational test and evaluation(LOT&E).
Pada November 2004, HIMARS berhasil menyelesaikan tes awal operasional dan evaluasi( IOT E).
The initial operational capability of eight aircraft; four trainers and four mission-ready aircraft, plus test aircraft- is expected in fiscal year 2015.
Kemampuan operasional awal delapan pesawat- empat pelatih dan empat pesawat misi-siap, ditambah pesawat uji- diharapkan dalam tahun fiskal 2015.
The first LCAC was delivered to the Navy in 1984 and Initial Operational Capability(IOC) was achieved in 1986.
LCAC pertama dikirim untuk AL AS pada 1984 dan Kemampuan Operasi Awal( IOC) di capai pada 1986.
Initial operational evaluation(OPEVAL) was successful and a decision on full-rate production of 1,227 helicopters was authorised in December 2007 with the award of a five-year contract.
Evaluasi operasional awal( OPEVAL) berhasil dan keputusan mengenai produksi full-rate 1.227 Helikopter diberi wewenang pada bulan Desember 2007 dengan pemberian kontrak lima tahun.
The first flight of theT-50 took place in August 2002, and initial operational assessment from 28 July to 14 August 2003.
Penerbangan pertama dari T-50 berlangsungpada bulan Agustus 2002, dan penilaian operasional awal dari 28 Juli sampai 14 Agustus 2003.
The project has achieved initial operational clearance, with the first of two jets set to be handed over to its customer, the Indian Air Force, at the Aero India show- a terrific splash of an idea.
Proyek ini telah mendapat izin operasional awal, dimana pesawat pertama dari dua unit yang direncanakan akan diserahkan kepada Angkatan Udara India, di Aero India show.
As of November 2018,the Air Force's plan was still to reach initial operational capability with the system on the F-15C in 2020.
Pada November 2018,rencana Angkatan Udara masih untuk mencapai kemampuan operasional awal dengan sistem pada F-15C pada tahun 2020.
We're hoping to[get to initial operational capability] within three to four years, and all of that is due to doing it as an experimental test program vice a long compliance period.”.
Kami berharap untuk[ mencapai kemampuan operasional awal] dalam tiga hingga empat tahun, dan semua itu karena melakukannya sebagai program uji coba eksperimental, dan bukannya periode kepatuhan yang panjang.
The first flight of theT-50 took place in August 2002, and initial operational assessment from 28 July to 14 August 2003.
Penerbangan pertama T-50 terjadipada Agustus 2002, dan pengujian tugas operasional pertama mulai Juli 28 sampai 14 Agustus, 2003.
He said he hoped to certify an“initial operational capability” or IOC of F-35 jets at the early end or“leading edge” of an August-to-December time frame set by the Air Force several years ago.
Dia berharap bisa mengesahkan initial operational capability atau IOC dari jet F-35 pada akhir awal Agustushingga Desember 2016, seperti waktu yang telah ditetapkan oleh Angkatan Udara beberapa tahun yang lalu.
The 4th TFS'Fightin' Fujins',was the first USAF squadron to achieve Initial Operational Capability(IOC) on November 12th, 1980.
Th TFS' Fightin' Fujins',adalah skuadron USAF yang pertama yang telah berhasil melakukan Initial Operational Capability( IOC) pada tanggal 12 November 1980.
The U.S. Navy expects to declare initial operational capability on Harpoon Block II+ this year, according to a recent Boeing release, and said it continues to develop an extended-range Harpoon.
Angkatan Laut AS direncanakan akan mendeklarasikan initial operational capability( IOC) rudal Harpoon Block II+ pada tahun ini, menurut rilis Boeing, dan mengatakan Boeing akan terus mengembangkan jangkauan Harpoon dengan jangkauan lebih jauh( extended range Harpoon).
As the latest type of air/air missile in US inventory,AIM-120D has achieved initial operational service with US Navy F/A-18 in 2015.
Sebagai jenis rudal udara-ke- udara terbaru dalam inventori AS,AIM-120D telah mencapai initial operational service dengan F/ A-18 AL AS pada tahun 2015.
The IAF has ordered 123 Tejas,of which 20 are the initial operational clearance(IOC) version while another 20 are the FOC version.
Angkatan Udara India( IAF) telah memesan 123 Tejas,20 di antaranya adalah versi Initial Operational Clearance( IOC) sementara 20 lainnya adalah versi FOC.
The memo, issued on August 24, 2018, says the program has not met the necessary entry criteria tobegin the crucial combat-testing phase called Initial Operational Test and Evaluation(IOT&E).
Memo tersebut dikeluarkan tanggal 24 Agustus 2018, mengatakan program tersebut belum memenuhi kriteria yang diperlukan untuk memulai tahapan pengujian tempuryang penting yang disebut sebagai Uji dan Evaluasi Operasional Awal( IOT E).
Using two of those six systems, the Marine Corps achieved G/ATOR Initial Operational Capability(IOC) of the air surveillance mission in February.
Dengan menggunakan 2 dari enam sistem tersebut, Korps Marinir mencapai Initial Operational Capability( IOC) G/ ATOR dari misi pengawasan udara pada bulan Februari tahun ini.
I think a realistic timeline is somewhere around 2028 with key investments in some key technology areas,you would be able to have some initial operational capability of a penetrating counter air capability.".
Saya pikir waktu yang realistis adalah sekitar 2028 dengan investasi dalam beberapa bidang teknologi kunci,Anda akan bisa memiliki beberapa kemampuan operasional awal dari kemampuan menembus udara kontra.
Utilizing two of those six systems, the Marine Corps achievedG/ATOR Initial Operational Capability(IOC)of the air surveillance mission in February of this year.
Dengan menggunakan 2 dari enam sistem tersebut, Korps Marinir mencapai Initial Operational Capability( IOC) G/ ATOR dari misi pengawasan udara pada bulan Februari tahun ini.
In case of fighter jets, the HAL is listed to make 123 Tejas planes;of these 20 are called the initial operational clearance(IOC) version and another 20 the FOC version.
Angkatan Udara India( IAF) telah memesan 123 Tejas,20 di antaranya adalah versi Initial Operational Clearance( IOC) sementara 20 lainnya adalah versi FOC.
In a way,IOT&E testers will have to make up for an early declaration of Initial Operational Capability(IOC), which means the plane is available in its minimum usefully deployable form.
Di satu sisi,IOT E penguji harus menebus deklarasi awal Initial Operational Capability( IOC), yang berarti pesawat tersedia dalam bentuk minimum yang dapat digunakan.
General Norton Schwartz has said that the software is thebiggest factor that might delay the USAF's initial operational capability which is now scheduled for April 2016.
Jenderal Norton Schwartz mengatakan bahwa perangkat lunak adalah faktor terbesar yangmenyebabkan penundaan kemampuan awal operasional( IOC) Angkatan Udara Amerika Serikat yang sekarang akan dijadwalkan pada april 2016.
Grazier said the Pentagon musthave a properly functioning JSE to complete initial operational test and evaluation(IOT&E), which is required to properly inform the FRP decision.
Grazier mengatakan Pentagon harus memilikiBEJ yang berfungsi dengan baik untuk menyelesaikan tes operasional awal dan evaluasi( IOT E), yang diperlukan untuk menginformasikan keputusan FRP dengan benar.
Results: 97, Time: 0.0349

Word-for-word translation

Top dictionary queries

English - Indonesian