Examples of using Reprocessing plant in English and their translations into Russian
{-}
-
Official
-
Colloquial
Each reprocessing plant is unique.
What is needed to verify a shut-down reprocessing plant during dismantling?
A reprocessing plant should have a co-located MOX fuel fabrication facility;
It is presupposed that in the future a reprocessing plant and a MOX fabrication plant would be built next to each other.
In addition, there is the possibility of producing andextracting fissile material, uranium-233, without sending the irradiated material to a reprocessing plant.
Safeguarding a reprocessing plant is a costly and resource intensive task.
Mr. Joachim Lausch, Dr., made a presentation on the technical aspects of decommissioning the pilot reprocessing plant in Karlsruhe/Germany and the accompanying safeguards.
The reprocessing plant in Marcoule ended all activity regarding fuel for defense purposes in 1993.
If these materials are used, they are transported as little as possible(for example MOX fuel fabrication takes place at the site of the reprocessing plant or storage place);
The spent fuel reprocessing plant at La Hague is the European facility most thoroughly inspected by Euratom.
According to Munir Ahmad Khan,the nuclear facility at Trombay consisted of a plutonium production reactor, a reprocessing plant, and other facilities associated to weapon production.
The Rokkasho Reprocessing Plant has, for instance, been placed under a"continuous safeguarding system", which was jointly developed by Japan and IAEA.
Registered an increased release of radionuclides to the atmospheric pipe building reprocessing plant 238.8 mCi, with the share of Cs-137 was 4.36% of the annual emission limit of this radionuclide.
I said also that no agreement had been reached with the DPRK about the installation of Agency monitoring equipment at nuclear waste tanks in the DPRK's Reprocessing Plant.
Sellafield nuclear reprocessing plant in West Cumbria where he was Head of Reprocessing, before becoming Deputy Managing Director in 2007.
Plutonium: produced in plutonium-producing G1, G2 and G3 reactors at Marcoule(1956-1984),then separated at the UP1 reprocessing plant at Marcoule, established in 1958 and shut down in 1997.
The safeguards approach for a reprocessing plant would depend on a range of considerations, chief among which is its operational status- whether it is in operation, stand-by mode, decommissioned or abandoned.
The integrated safeguards system has now been implemented in Japan andthe world's first site level integrated safeguards approach was introduced last month for facilities, including a reprocessing plant, in the most efficient manner.
Historical lessons would be useful,such as the reprocessing plant at Sellafield in the United Kingdom of Great Britain and Northern Ireland, which had first been military and then became a civilian facility under EURATOM.
France closed down and started to dismantle its fissile material production facilities for nuclear weapons in Pierrelatte in 1996 andin Marcoule between 1986 for the reactors and 1993 for the reprocessing plant.
Under the October 3 agreement, disablement of the three core facilities at Yongbyon- the 5MW(e) reactor,the radiochemical laboratory(reprocessing plant), and the fresh fuel fabrication plant- was to be completed by December 31, 2007.
The Rokkashomura plant is unique in that the IAEA has been able to monitor and verify all stages of construction,a factor now considered essential for effective safeguards for any new reprocessing plant.
Turning to nuclear safety andsecurity issues, he indicated that the recent, widely reported leak at the Thorp reprocessing plant at Sellafield in the United Kingdom had been contained without any release into the environment or harm to staff.
Former director, Yongbyon Nuclear Research Centre, oversaw three core facilities that assist in the production of weapons-grade plutonium: the Fuel Fabrication Facility,the Nuclear Reactor, and the Reprocessing Plant.
Mr. Joachim Lausch, Dr.,(retired from WAK GmbH, Karlsruhe Reprocessing Plant Decommissioning and Waste Management Company, Germany),presented the technical work on decommissioning the pilot reprocessing plant in Karlsruhe and the accompanying implementation of safeguards.
One participant cited the example of a non-nuclear-weapon state which had overcome technical difficulties andapplied safeguards on a reprocessing plant that had been designed and built without verification in mind.
During the tours, the participants had access to the former uranium enrichment plant at Pierrelatte and, at the Marcoule site, they visited one of the three plutonium-producing reactors being dismantled,as well as the former military reprocessing plant.
It is now evident that a small-scale reprocessing plant had been designed, constructed, installed and commissioned in the hot cells of building 22(LAMA) at the Iraqi Atomic Energy Commission(IAEC), Tuwaitha, and was ready to commence operation in January 1991.
The consultations would also cover issues related to safeguards implementation in the Democratic People's Republic of Korea,including the installation of monitoring equipment at nuclear waste tanks in the reprocessing plant and monitoring the freeze.
However, this was not the only case of cooperation between the two in the aftermath of an accident: in 1993,following an explosion at a reprocessing plant in Tomsk, Russian Federation, the Committee secretariat took part in the IAEA mission that assessed the radiological consequences.