Примеры использования Each component на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Each component is described like this.
Operational principles of each component of the retrofit system.
Each component was engineered with your needs in mind;
Operational principles of each component of the retrofit system.
Equivalence files consist of one line for each component.
Each component has a purpose and a reason to be part of the system.
Capacity-building will be an integral part of each component.
Each component is then hand inspected for remaining imperfections.
Ii. The spreadsheets give codes for each component, with descriptions.
Each component must work absolutely reliable in any situation.
In our example we need to display the data for each component separately.
Let us consider each component of this stage in detail.
Begun work on the drafting of elements of guiding principles for each component.
Each component of the financial statements should be clearly identified.
Another dimension applied in each component is current price.
Each component was revalued in annual average prices of the preceding year;
Monitored results for each component of the defined road system.
Each component of the annual financial statements shall be identified clearly.
An own name or code can be set for each component maximum 6 characters.
Pilot each component of the training program with the target audience.
Information is provided in section II above and in the summary for each component.
Each component has close synergies with international mental disability standards.
Displays a summary of the overall client status anda summary of activity for each component.
Each component is optimally adapted to the individual requirements of the customers.
General scheme of the retrofit system containing the following information of each component.
Each component calls the corresponding command of data processing in the database.
Equivalence files are lookup tables associating each component with it's footprint.
Each component of the project is preceded by a public information campaign.
A detailed description of the changes proposed under each component is provided in the budget document.
Each component was developed separately and added on to the existing infrastructure.