Примеры использования Revised cost estimate на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Original revised cost estimate.
Revised cost estimate for the period from.
In addition, the present report contains the revised cost estimate for the period 1 June to 30 September 1994 and the monthly cost thereafter.
Revised cost estimate for the period from.
Following a review of the cost estimate presented by Syria,the Panel has developed a revised cost estimate for a project of reduced scope that it considers reasonable.
Люди также переводят
Iv. revised cost estimate for the period.
The Panel has developed a revised cost estimate for the project by separately costing its various components and using standardized rates.
Iii. revised cost estimate for the period from.
The decrease reflected in the revised cost estimate is attributable to the suspension of rental of 70 apartments at a cost of $400 per month per apartment.
Vii. revised cost estimate for the period from.
Viii. revised cost estimate for the period.
Revised cost estimate for the period from.
Revised cost estimate for the period from 5 April.
Revised cost estimate for the period from 9 february.
Revised cost estimate for the period from 1 May.
Revised cost estimate for the period from 1 November 1993.
III. Revised cost estimate for the period from 10 June to.
Revised cost estimate for the period from 1 January to.
Revised cost estimate for the period from 10 December 1994 to.
Revised cost estimate for the period from 1 November 1994.
Revised cost estimate 1 October 1994 to 31 March 1995.
Revised cost estimate of the United Nations Assistance Mission.
The revised cost estimate for the mandate period from 1 June to 30 September 1994 is based on the parameters provided below.
The revised cost estimate reflects the decrease in the number of international and local staff to 102 and 65, respectively;
The revised cost estimate takes into account the decrease in number of civilian staff for whom linen/laundry services are provided.
As provided in the revised cost estimate, one L-100 heavy cargo and one B-200 light passenger aircraft were utilized as planned.
The revised cost estimate includes additional requirements for the increase in the United Nations vehicle establishment from 733 to 812 vehicles, excluding trailers.
The revised cost estimate for the six-month mandate period ending 9 June 1995 was calculated, where applicable, on the basis of the cost parameters indicated below.
The revised cost estimate for the 6.7-month period ending 31 December 1995 was calculated, where applicable, on the basis of the cost parameters indicated below.
The revised cost estimate reflects the projected cost of the transport of medical equipment and vehicles in connection with the repatriation of the medical support personnel by 1 October 1996.