Приклади вживання Working draft Англійська мовою та їх переклад на Українською
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
We already have a working draft Concept.
Division of landwith layout planning(in accordance to the working draft).
Early working draft proposal that was never formally circulated within.
The name of the newspaper is still in the working draft,”- said Smirnov.
Order the draft or working draft, on which you can build a House.
Consulting, training, creation of design- project, working drafts, implementation.
The second consisted of a working draft, which was approved by the state expert examination.
Such objects are technically simple, because for them, provided only a working draft.
Among them:"working draft","draft design","Structural section" and"Engineering section".
We agree on all the details and the moments and proceed to develop the working draft of the building.
In addition, developed working draft is required to obtain a permit for construction or reconstruction.
Indeed, the 20 open tabs in thebrowser is not something that helps to concentrate on the working draft.
On approving the working draft plan for the construction of an integrated telecommunications system in the Government Building.
Neither a requirement that forests be managed sustainably nor any other“safeguards” in the various working drafts would stop this.
Working draft: fish protection system on the Lomovska pumping station. Customer: Dneprovodokanal, 2012.
Section“Development of technical specifications and working draft of the system for early detection of emergencies and alerting people in the event of their detection”.
If you want to get a durable building, use the services of a design bureau ora construction company that will develop a working draft for you, taking into account all standarts.
The working draft makes provision for limitations of vessel speed along the marine approach canal and the Bystoe mouth- 7 knots.
In contrast to the design project, which indicates the shapes and colors, the working draft includes construction drawings, specifications of finishing materials, design drawings of furniture.
Also completed a working draft of the completion of the construction of village culture club and gas separately constructed furnace village culture club(2005-2006).
Technical inspection of buildings is the first step for the development of the detailed design for the reconstruction, modernization,or repairing of a building, or a working draft strengthen certain building structures to bring them to normal operation.
In the final step the working draft, which takes into account all the nuances buivnitstva is the height of the walls, ceilings, etc.
The Office of the Colorado Secretary of State published a new working draft of its“Rules Concerning Campaign and Political Finance” which notably includes a new section on cryptocurrency donations.
Without pre-developed working draft(construction documents) it is difficult and sometimes impossible to bring to life the idea of the construction or reconstruction of any building or structure, our engineering company LLC“Harkovstroyniproekt performs these services.” This can be a full time project with all sections or just working drawings of building structures, and it does not matter whether it's an apartment redevelopment, construction of a residential building, construction or reconstruction of the factory, warehouse or office building.
On our website are examples of our projects of houses and cottages, a working draft, rough draft, Design section, Engineering section of all that you get for the price of 75 USD per 1 m2 of the future construction of homes and cottages.
On our website are examples of our projects of houses andcottages, a working draft, rough draft, Design section, Engineering section of all that you get for the price of 75 USD per 1 m2 of the future construction of homes and cottages.
In any case,the presence of an EIA or environmental protection sections of the working draft of the detailed descriptions of the environment and minimize the possible negative effects demonstrates the seriousness of the designer and literacy, and hence the project owner.
The work draft of the decision regarding the first stage of sectoral sanctions is to be approved today, on July 29.