For example, you may be digging a trench,laying a cable and then backfilling the trench.
Dozer blades can also be used for some backfilling, just like other smaller crawler excavators.
Backfilling of directories was done in October 2013 as part of an overall improvement to the security model for Azure.
Its Twin R2000 with ancillary jetting spread wascontracted for shallow water post-lay trenching and backfilling.
After last year's partial backfilling of the damaged roads, basically all the models can now pass smoothly.
It does not include energy recovery andthe reprocessing into materials to be used as fuels or for backfilling operations.
If backfilling in large areas of depressions, harbors, valleys, etc., it is necessary to consider whether it will destroy the ecological environment.
The loading dock will be closed all day on Tuesday andWednesday this week for backfilling of gravel around the sub-basement and basement walls.
It is necessary to strictly follow the technical specifications for construction, and to complete five quality checks such as preparation, laying, splicing,inspection and backfilling.
The Panel also considers that theproblems relating to the disposal of excavated material and the backfilling of excavated sites have not been adequately addressed.
It is necessary to strictly follow the technical specifications for construction, and to complete five quality checks such as preparation, laying, splicing,inspection and backfilling.
Annex iii revegetation of oil-contaminated areas andareas physically disturbed by the construction and backfilling of oil trenches and pipelines(paragraphs 104 to 123).
The Panel finds that the excavation and backfilling of trenches and pipelines altered the soil profile in the physically disturbed areas by burying biologically active topsoil and exposing infertile subsoil.
To keep the platform scalable, we ensured all data modeling and transformation only happened in Hadoop,enabling fast backfilling and recovery when issues arose.
Data for 1995 on a comparable basis have been the subject of a backfilling exercise in IMIS, in comparison with a series of ad hoc data sets maintained at that time by individual offices.
These staff have moved into off-site space made available by thereturn of other staff to the Secretariat Building, by backfilling space in other existing leased annex buildings.
Kuwait asserts that physical disturbance resulting from the construction and backfilling of the pipeline network and oil trenches caused rupture of the thin surface layer and the compaction and fracturing of the soil.
For areas affected by oil spills, oil trenches,and areas that have been physically disturbed by the construction and backfilling of oil trenches and pipelines, natural recovery should be relied upon.
Kuwait proposes to stabilize the areas damaged by the construction and backfilling of military fortifications by applying a 2.5-centimetre layer of gravel to control erosion and encourage the re-establishment of indigenous species.
Regulations for installations of wells concern the use of hazardous materials andproper backfilling of the drilling hole to avoid hydraulic short circuiting between aquifers.
Kuwait also submitted information to support its contention that the construction and backfilling of military fortifications have contributed to increased sand mobilization in the affected areas.
The frozen soil in the backfill should not exceed 15% in winter.
Dig Trench Lay Cable Backfill.
Some of that money he says could backfill funding NIAID had previously shifted to Zika from malaria, flu, and tuberculosis research.
It has applications in retaining walls and backfills, service yard construction, road and street construction, and other such applications.
Backfill of void mine spaces to improve geomechanical stability and/or to provide special geochemical conditions.
In addition, the construction period is tight andthe quality requirements are high(backfill quality, pavement construction quality).
The filter material filling in theaquifer area should meet the requirements, and the backfill should have a certain high height.
Assessment should be made during installation and where necessary additional measures,such as corrosion resistant backfill used.