Examples of using Shift system in English and their translations into Dutch
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Computer
-
Ecclesiastic
-
Official/political
-
Programming
Present shift system 1975.
Shift system of the ambulance unit at an airport.
Original shift system to 1974.
We build it with a Shimano Deore/SLX shift system.
First shift system August 1970-Sept 1978.
Ludovik also adapted his planning entirely to our shift system.
Quick Shift System(QSS) gives faster upshifting.
Traditional mechanical automatic shift system, drive stably.
Shift system of workers monitoring control panels.
Analysis of the shift system of firemen at an airport.
Shift system of workers monitoring control panels in a gas works.
The complaints uttered against the shift system of the husband are classic.
Original shift system to 1974 is not described It was based on 4 crews.
This bonus sometimes depends on the shift system worked, but in some countries e.g.
At the shift system of the Sturmey-Archer 3-speed(fig. 12)
is the key to the Sport Shift system.
We work in a shift system, which provides a lot of flexibility and variation.
In addition, the timing of his temperature acrophase appeared to be relatively unaffected by the shift system.
There have been very few innovations in the shift system in the Belgian chemical sector up till now.
Present shift system introduced in 1970 as changeover from semicontinuous to continuous working.
We list the absenteeism figures for both companies and the absentee statistics per shift system from 1977 to the present.1.
Operating mode shift system adopted, approximate dates of operating periods in year, etc.
The degree to which participation in more formalized social activities will be affected will though, again, depend on which shift system is being worked.
The cycle duration of this shift system was extremely short with two weeks,
this is called a double day or two shift system.
The duration of a cycle of a shift system is now with 21 weeks shorter than before,
Although these differences are insufficiently reliable statistically, it would appear that it is mainly the workers on the most difficult shift system who would opt for the shorter days of the 4x6 shift system. .
We work in a shift system: one day the early shift,
a study was begun to investigate examples of innovations in the shift system in the chemical sector.
Operating mode influencing its production shift system adopted, approximate dates of operating periods in year, etc.