Examples of using Formwork in English and their translations into Arabic
{-}
-
Colloquial
-
Political
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Installing formwork for pillars.
Bridge subway construction metal tunnel formwork panel.
Curve formwork system, Irregular formwork, etc.
The single-sided bracket is compatible with HORIZON's wall formwork.
The Formwork boarding is removed when the concrete dries.
People also translate
The main thing to do correctly formwork. The design must be split.
The economy formwork panel's main application is for vertical walling.
Application: Support for slabs, beams and other horizontal formwork.
New type of building PVC formwork can revolve more than 30 times.
Formwork remove not earlier than concrete hardens(it takes 1-1.5 weeks).
The single-sided bracket is compatible with HORIZON's wall formwork panels.
At the same time, formwork should buy this kind of as in the photo.
Take the 10-centimeter blocks and form of which the formwork on the perimeter walls.
Formwork watered to further it is not pulling moisture from the concrete mortar.
The length of panel struts are selected according to the height of the formwork panels.
Level formwork system, Vertical formwork system, Adjustable formwork system.
In this case, it will be necessary to do the formwork and a few weeks to wait until the concrete hardens completely.
Formwork is a type of board which is used to hold wet concrete as it dries.
The wide range of Tata Steel formwork profiles ensure the optimum solution is available.
Aluminum Formwork designed and produced for more than 10 sets buildings per month.
Construction works(manufacturing of the frame of buildings, roofing for roofing, formwork for the foundation, inter-floor coverings, arrangement of floors);
Climbing formwork is a special type of formwork for large vertical concrete structures.
After pouring rattles wooden hammer or bar of the formwork walls- this will further ensure the correct distribution of the mixture.
The aluminum formwork system components need to be designed in accordance with the characteristics of the floor, which has a higher requirement for the design and technical personnel.
After drying set wooden formwork, the width of the board should be at least 4 cm, and fill the bumpers.
When installing formwork with their hands need to ensure that between the boards did not have big gaps, otherwise the solution will leak.
Steel Decking Formwork provides a fast, efficient method of creating suspended concrete slabs.
Therefore, the aluminum formwork system is suitable for high-standardized high-rise buildings or multi-story buildings. Villa complex.