Examples of using Formwork in English and their translations into Hungarian
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Financial
-
Programming
-
Official/political
-
Computer
DUO Universal Formwork.
Filter Formwork and Services.
Mold: Use the“lkm” formwork.
DOKA- The Formwork Experts.
Formwork for concrete: basic characteristics, structural.
People also translate
Installing formwork for pillars.
Supplier of: Mechanical engineering- custom work| metal formwork.
DOKA system formwork(support included).
Manufacturing of shelving, furniture, packing, shelves and demountable formwork.
Great Britain MEVA Formwork Systems Pte Ltd.
Curve formwork system, Irregular formwork, etc.
Manufacturer of scaffolding, formwork, shoring towers, roofs.
Doka formwork was used in Dubai to help construct the world's tallest building.
PERI-RINGER system formwork(support included).
Formwork technology The technology of manufacturing non-removable formwork consists of the stages.
Hence, the AluStar formwork had to be transported by hand.
Metal reinforcement cage used for pouring monolithic concrete structures: foundation, walls,floors, formwork.
How to make a formwork for the fence with his own hands?
Planning made easier with Doka Formwork Design Software 9.
After that, the formwork is put and everything is poured with special concrete.
With new functions, you can customize your formwork solution and minimize your workload.
After this, the formwork is disassembled, and the mold is carefully separated from the samples.
Our services for your projects- Formwork, scaffolding and engineering from one source.
Girder formwork is used much less today than was previously the case, and mostly for special applications.
Extra-long T 70 formwork girders are used for the construction.
Large-area formwork Top 50Framed formwork Framax XlifeShaft platformGuid ed climbing formwork Xclimb 60.
How to make a formwork with your own hands| Do it yourself.
How to make a formwork for the foundation- a detailed description of.
Schalung und Gerüste"(formwork and scaffolding) becomes part of the PERI logo from 1985-1989.
Thanks to the Doka formwork solution, the fast cycle times required on this build were accomplished to perfection.