Examples of using Lead-time in English and their translations into Russian
{-}
-
Official
-
Colloquial
Q: What is the production lead-time?
Lead-time, Delivery& Installation.
A3: Our strength is in quality control and flexible lead-time.
Flexible lead-time can save time for hotels that need.
Hebei Mingda follows customer's CAD drawing exactly to offer competitive price and short lead-time delivery.
Lead-time reduction and alternative sourcing solutions;
Fast defrosting under vacuum increases operational flexibility as it reduces lead-time in the production process.
Flexible lead-time can save time for hotels that need urgent opening.
Using a single service provider like Uddeholm reduces lead-time and increases productivity.
A five-year lead-time for achieving results on the enormous challenges before us may not seem to be so long.
Rinnai's proprietary multiproduct, mixed-flow production system was developed to improve quality and shorten lead-time to delivery.
We always supply our customers with lowest-failure-rate,fast lead-time, cost-effectiveness, and best after-sales service.
Policies should be technology neutral, consistent and long-term oriented in order toprovide predictability and adequate lead-time;
We would have to assess technical specifications,financial implications, lead-time to replace existing stocks, assistance& co-operation, and other related questions.
Short lead-time for making samples by using own fabrics- KANOX and MAZIC, we are also keeping the purchase procedure for outsourced materials as short as possible.
Ensure that all systems are tested for year 2000 compliance,with sufficient lead-time to address any deficiencies.
Since programme implementation requires lead-time, some programmes do not allow a rapid response to sudden changes in actual income levels.
However, the International Federation on Ageing expressed the opinion that holding the second Assembly in 2002 did not allow sufficient lead-time for adequate preparations.
Local purchases helped support local production while reducing costs and lead-time, resulting in more efficient delivery of assistance to beneficiaries.
Shortest possible lead-time for deliveries without compromising flexibility by enabling UNDP country offices or other clients to waive the need for international bidding exercises;
The stand-by force arrangement could be vital in improving the planning,reducing the lead-time and increasing the flexibility in the peace-keeping field.
A major challenge to these LDCs is to increase overall competitiveness in the garment industry, i.e. in the areas of productivity, product quality, andreliability in terms of supply lead-time.
In addition, the market survey mechanisms for collecting data regarding reliable sources of supply,trend of prices and the lead-time required for the supply of materials should be strengthened.
This packaging reduces the lead-time between policy reform, technical assistance and investment in order to maintain political will and momentum through quickimpact initiatives.
In addition, the number of assets pending disposal far exceed the number of disposed assets,which has resulted in a long write-off and disposal lead-time.
At the same time, we recognize the need for sufficient lead-time to enable the Secretariat to develop, and prepare properly for, the discussions of the Economic and Social Council.
In this connection,the Advisory Committee points out that the performance report should have contained adequate explanation of savings resulting from"insufficient lead-time to procure budgeted items.
Given the lead-time needed to ensure the adequate preparation of such an international year, I should appreciate the inclusion of a relevant item on the agenda of the Economic and Social Council at the earliest date possible, in accordance with the Council and General Assembly directives concerning international years.
The Board recommends that the Administration review the procurement process and the role of each section, taking into consideration the significance of adding value to the process,preventing duplication of efforts and reducing procurement lead-time.
Integrated analysis of space- and ground-based observations may provide effective monitoring andearly warning of drought disasters and give valuable lead-time for stakeholders to take measures to prevent drought hazards from becoming major disasters.