What is the translation of " VARIABLE COSTS " in Norwegian?

['veəriəbl kɒsts]

Examples of using Variable costs in English and their translations into Norwegian

{-}
  • Colloquial category close
  • Ecclesiastic category close
  • Ecclesiastic category close
  • Computer category close
Variable costs: types, calculation formula.
Variabelkostnad: typer, beregningsformel.
But as with any purchase must face a series of fixed and variable costs.
Men som med alle kjøp må møte en rekke faste og variable kostnader.
Variable costs increased for Hydro's smelter operations during the quarter.
De variable kostnadene økte for Hydros smeltevirksomhet i kvartalet.
The difference between the price we choose to take and our variable costs.
Differansen mellom den prisen vi velger å ta, og våre variable kostnader.
By studying variable costs, you can improve the performance of the company.
Ved å studere variable kostnader kan du forbedre ytelsen til selskapet.
Costs are usually divided between Fixed costs and variable costs.
En annen årsak er generelt høye faste kostnader og små variable kostnader.
Variable costs, on the other hand, change depending on the number of participants.
Variable kostnader, derimot, endres avhengig av antall deltakere.
Total energy cost can represent 65-75% of variable costs in the process.
De totale energikostnadene kan utgjøre 65- 75 % av de variable kostnadene i prosessen.
ERate offers variable costs in line with the customer's growth and complexity.
ERate tilbyr variable kostnader i tråd med kundens vekst og kompleksitet.
The use of music as compensation also illustrates how there is sometimes a trade-off between fixed and variable costs.
Bruken av musikk som kompensasjon illustrerer også hvordan det noen ganger er en avveining mellom faste og variable kostnader.
Higher variable costs were offset by lower fixed costs for the quarter.
Høyere variable kostnader ble utliknet av lavere faste kostnader i kvartalet.
Statkraft has production plants with low variable costs, long lifespans and low carbon emissions.
Statkraft har produksjonsanlegg med lave variable kostnader, lang levetid og lave CO2-utslipp.
Variable costs, on the other hand, change depending on how many participants you have.
Variable kostnader, på den annen side, endre avhengig av hvor mange deltakere du har.
For example, in a lab experiment, variable costs might come from paying staff and participants.
For eksempel, i en lab eksperiment, kan variable kostnader kommer fra å betale ansatte og deltakere.
Variable costs at our smelters were stable compared to the third quarter of 2009.
De variable kostnadene ved smelteverkene var stabile sammenliknet med tredje kvartal 2009.
For example, in a lab experiment, variable costs might come from paying staff and participants.
For eksempel, i et laboratorieeksperiment, kan variable kostnader komme fra betalende ansatte og deltakere.
Variable costs at our smelters were stable compared to the second quarter of 2009.
De variable kostnadene ved våre smelteverk var stabile sammenliknet med andre kvartal 2009.
Cost reduction initiatives covering both fixed and variable costs have also been implemented throughout the organization.
Kostnadsreduksjonstiltak som dekker både faste og variable kostnader er også iverksatt i hele organisasjonen.
To drive variable costs all the way to zero, however, a different approach is needed.
For å drive variable kostnader helt frem til null, er imidlertid en annen tilnærming er nødvendig.
The incremental fixed costs of LM2,000 per annum, and the variable costs of materials, labour, and other expenses;
Eks inkrementelle faste kostnadene av LM2,000 per år, og de variable kostnadene for materialer, arbeidskraft og andre utgifter;
Variable costs are business expenses that change when production volumes change.
Variable kostnader er forretningsmessige kostnader som endrer seg når produksjonsvolumene endres.
Our analysis combines the results from the RAM analysis with cost parameters of both investments,fixed costs and variable costs.
Vår analyse kombinerer resultatene fra RAM-analysen med kostnadsparametre for både investeringer,faste kostnader og variable kostnader.
The variable costs of hydropower production are low, since water, the actual energy source, is free.
En vannkraftprodusent har lave variable kostnader siden innsatsfaktoren, vann, er gratis.
The economic activities of the research organisation must cover all relevant variable costs and an appropriate contribution to fixed costs..
Den økonomiske virksomheten må dekke de relevante variable kostnadene, og også en forholdsmessig andel av de faste kostnadene..
In turn, variable costs, which include raw materials, salaries for workers and transportation, amount to 50,000 rubles.
I sin tur utgjør variable kostnader, som inkluderer råvarer, lønn for arbeidere og transport, 50 000 rubler.
We use an EPO calculation(earnings per order)which involves all the variable costs, including stock-handling, shipping costs, customer service and return handling.
Vi bruker en beregning av IPO(inntjening pr. ordre)som inneholder alle variable omkostninger inkludert lagerhåndtering, frakt, kundeservice og returhåndtering.
Variable costs increased somewhat compared to the fourth quarter of 2009, mainly due to higher alumina costs..
Variable kostnader økte noe sammenliknet med fjerde kvartal 2009, hovedsakelig som følge av høyere aluminakostnader.
Furthermore, the fixed and variable costs are allocated to the relevant activities to prevent any cross-subsidisation.
Dessuten fordeles faste og variable kostnader på de forskjellige aktivitetene for å hindre eventuell kryssubsidiering.
Variable costs increased by roughly NOK 100 million during the quarter mainly due to higher petroleum coke prices.
De variable kostnadene økte med om lag 100 millioner kroner i kvartalet, hovedsakelig på grunn av høyere priser på petroleumskoks.
If you know what your fixed and variable costs are, it is possible to calculate how much you need to sell in order to be profitable.
Hvis du kjenner omkostningsstrukturen for dine faste og variable utgifter, kan du også beregne hvor mye du må selge for at bedriften skal være lønnsom.
Results: 58, Time: 0.0368

How to use "variable costs" in an English sentence

These are variable costs and fixed costs.
The variable costs per job is $35.00.
Your variable costs incurred for each sale.
Some variable costs are your marketing budget.
Variable costs change proportionately to increased production.
Fixed and Variable Costs and Burn Rate.
This is where variable costs come in.
High variable costs must push high prices.
of both variable costs and fixed costs.
Variable costs are unstable with the workload.
Show more

How to use "variable kostnader" in a Norwegian sentence

Pure variable kostnader Pure variable kostnader øke i direkte forhold til produksjonsvolum.
Variable kostnader Variable kostnader varierer med aktiviteten i bedriften, med produksjonen eller salget.
Variable kostnader Disse kan ha flere navn.
Andre variable kostnader kan OED anslå.
Variable kostnader beregnes altså ut fra handlingsplanen.
Andre variable kostnader Sum variable kostnader DEKNINGSBIDRAG (ekskl.
Unngå variable kostnader med Min IT-avdeling.
Som navnet antyder er variable kostnader variable.
Produktet med lavest variable kostnader A13.
Aktiveringa gjeld variable kostnader utover fast lønn.

Word-for-word translation

Top dictionary queries

English - Norwegian