Examples of using Control programme in English and their translations into Croatian
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
Control programmes. Come on.
The Community control programme; and.
Minimum content of the National Air Pollution Control Programme.
Population control programme for abandoned dogs.
National air pollution control programmes.
(iii) biological control programmes relying on ticks' natural enemies and pathogens;
Part of the Master Control Programme?
System's got more bugs than a bait store. I tell you,ever since he got that Master Control Programme.
The national air pollution control programmes and any updates.
Measures which may be included in the National Air Pollution Control Programme.
The national air pollution control programme shall be updated every two years.
Content of National Air Pollution Control Programmes.
The national air pollution control programme, including the analysis supporting the identification of policies and measures, should be regularly updated.
It requires Member States to draw up national air pollution control programmes.
The draft Community control programme shall be presented to the Committee referred to in Article 45(1) at least six months before the end of each calendar year.
The methodology for sampling plans,control plans and common control programmes for weighing;
Member States shall include in their national control programmes procedures on the recording by their officials of inspection reports in a paper or an electronic format.
The Commission may establish guidanceon the elaboration and implementation of national air pollution control programmes.
The sampling frequency may be further reducedif the national or regional Salmonella control programme demonstrates that the Salmonella prevalence is low in animals purchased by the slaughterhouse.
Each Member State shall take a sufficient number and range of samples to ensure that the results are representative of the market,taking into account the results of previous control programmes.
The proposal maintains the requirement for national pollution control programmes but adapted so as to maximise synergies with the ambient air quality directives and climate policies.
Member States shall consult, in accordance with relevant Union legislation, the public and competent authorities, which, by reason of their specific environmental responsibilities in the field of air pollution, quality and management at all levels, are likely to be concerned by the implementation of the national air pollution control programmes, on their draft national air pollution control programme and any significant updates prior to their finalisation.
Research goals: The basic research aim is discovering more effective control programme of swine bacterial disease that could be applied to the big herds as well as to the smaller farming.
That common control programme shall be based on a risk-based methodology for the determination of the size of the samples, levels of risk, risk criteria and the content of control plans.
Without prejudice to paragraph 3, the emission reduction policies andmeasures contained in the national air pollution control programme shall be updated within 12 months in either of the following cases.
Meanwhile, cost control programmes have been implemented in mass transportation and all other public sectors that operate within a bank-debiting framework supported by the Greek Public Office.
In Central America, the second phase ofsupport to the Central American Small and Light Weapons Control Programme(CASAC) entered its second year of implementation by the Security Commission of the Central American Integration System SICA.
Implementation of a mobile source emission control programme for light-duty vehicles, light-duty trucks, heavy-duty trucks and fuels to the extent required by sections 202(a), 202(g) and 202(h) of the Clean Air Act, as implemented through.
An inspection at the premises of the regulated supplier by the appropriate authority in accordance with its national quality control programme may be considered as an on-site verification, provided that it covers all the requirements of point 8.1.5.
Member States shall provide their national air pollution control programme to the Commission[within three months of the date referred to in Article 17, date to be inserted by OPOCE] and updates every two years thereafter.