Примеры использования Initial installation на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
This shall be verified upon initial installation.
Upon initial installation and after major maintenance.
Click Next at the initial installation window.
B Initial Installation A Press SETUP on the remote control.
Accuracy: Not required,but recommended for initial installation.
Initial installation of the Magnetic Level Indicator is simple.
For all FID analyzers, the FID shall be calibrated upon initial installation.
Perform the initial installation and configuration of Apache, MySQL(MariaDB), PHP.
Fuel flow-meters shall be calibrated upon initial installation.
This shall be verified upon initial installation and after major maintenance.
Exhaust flow-meters shall be calibrated upon initial installation.
Initial installation and commissioning by certified PRINOTH staff.
Intake air flow-meters shall be calibrated upon initial installation.
For all FID analysers: upon initial installation, and after major maintenance.
Number of departing refugees able to meet their departure and initial installation costs;
Upon initial installation or after system modification that would effect response.
This verification shall be performed after initial installation and after major maintenance.
Upon initial installation, within 185 days before testing, and after major maintenance.
This verification shall be performed after initial installation i.e. test cell commissioning.
PM balance: Upon initial installation, within 370 days before testing and after major maintenance.
The performance of your equipment may drift away from the standards established during initial installation.
During initial installation of Altium Designer, you have a choice over the core design functionality you want to be installed.
The performance of your equipment may drift away from the specified standards set during initial installation.
Calibrate, optimize, anddetermine CH4 response: upon initial installation and after major maintenance.
Instruments shall be calibrated for measuring pressure, temperature, anddew point upon initial installation.
This shall be verified upon initial installation, after major maintenance and within 370 days before testing.
See the Installation Guide for information on how to connect it during the initial installation phase.
Stand-alone pressure and temperature: Upon initial installation, within 370 days before testing and after major maintenance.
For information on how to manage your instance of Altium Infrastructure Server after initial installation, use the following links.